Server requirements for HallACE
The HallACE server foundation is selected for the scale of the specific project: number of gaming devices, workstations, venues and planned business development.
Resources are defined by the venue’s actual workload
A small gaming venue and a network of venues require different resource headroom, so the assessment begins with business scale and the operating model.
The number of gaming machines, VLTs and terminals is taken into account when preparing the server foundation.
Cashier, Back Office and other work areas are also part of the project’s overall workload.
The server model is planned differently for a single venue and a multi-site network.
If the project plans to expand, it is better to prepare the server foundation with future devices and venues in mind.
The goal is to prepare a sufficient foundation for current operations without unnecessary excess and without limiting future development.
What server requirements are based on
Preparing the server foundation means considering not one indicator, but the whole project model: gaming fleet, staff, number of venues and expansion plans.
Project size
The number of gaming areas and venues determines the overall workload level that needs to be considered in advance.
Gaming fleet composition
The more devices involved in HallACE operations, the more important it is to assess the server foundation correctly before launch.
Cashier and Back Office
Staff and work areas that use HallACE every day in operations are taken into account.
Single venue or network
For a gaming venue network, it is important to consider the total project scale rather than the parameters of one site alone.
Operational reliability
The server foundation should match the project’s normal workload and maintain comfortable headroom for workflows.
Future changes
If growth of the gaming fleet or new venue openings are planned, this should be built into the project in advance.
Need to define the server foundation for your HallACE project?
Describe the number of gaming devices, workstations and venues. We can help determine the right preparation level before installation.
From venue scale to the right server foundation
The assessment starts with the current project, then considers workflows and development plans so the server foundation matches the business’s real requirements.
Document the scale
We determine the number of venues, gaming devices, cashier points and administrative workstations.
Consider day-to-day operations
We review how staff and gaming areas will use HallACE under normal operating conditions.
Build in headroom
We prepare the server foundation so it confidently matches the project’s current model.
Allow for growth
We take possible gaming fleet expansion, new workstations and additional venues into account.
The server foundation is ready for the actual HallACE scale
After assessment, it is clear what preparation level the project needs now and what headroom should be allowed for future development without unnecessary cost.
Stable operating foundation
Gaming devices and workstations get a server environment that matches the project’s actual scale.
Predictable operations
Cashier and Back Office operate within one environment prepared for day-to-day operational tasks.
Resources without unnecessary excess
The project gets a foundation for the current workload with the ability to expand as the network or gaming fleet grows.
What to check together with server requirements
The server foundation is considered together with overall system requirements, hardware, the network and the HallACE installation process.
System requirements
Overall assessment of the operating environment for the scale and structure of the specific venue.
Hardware requirements
What needs to be prepared for gaming devices and staff workstations.
Network requirements
What needs to be considered for stable connectivity between the project’s gaming and work areas.
Installation process
The next step after preparing the venue, hardware and server foundation.
Prepare the server foundation for HallACE
Tell us about the project scale, gaming fleet and development plans. We can help determine which server foundation should be prepared before installation.